* . * . . .
  • Contact Us
  • Privacy Policy
  • Terms of Use
  • Cookie Privacy Policy
  • DMCA
  • California Consumer Privacy Act (CCPA)
Monday, May 19, 2025
Love Europe
  • Politics
  • Business
  • Culture
  • Opinion
  • Lifestyle
  • Sports
  • Travel
No Result
View All Result
  • Politics
  • Business
  • Culture
  • Opinion
  • Lifestyle
  • Sports
  • Travel
No Result
View All Result
Love Europe
No Result
View All Result
Home Bulgaria

Westinghouse extends FEED contract for new Kozloduy units

October 24, 2024
in Bulgaria
Westinghouse extends FEED contract for new Kozloduy units
Share on FacebookShare on Twitter
ADVERTISEMENT


Kozloduy currently has two operating reactors (Image: Kozloduy NPP)

The original contract was signed by Westinghouse in June 2023, to assess the readiness of Bulgarian industry and infrastructure at the site to support the construction of the proposed two new units. The next stage will be the engineering services contract and the start of the design, licensing, training, project management and planning process ahead of a construction contract.

Dan Lipman, President of Westinghouse Energy Systems, said: “Westinghouse is committed to the Kozloduy project and to further strengthening and leveraging Bulgaria’s supply chain to support this critical project for the Balkans and others across Europe. We appreciate the close collaboration with Kozloduy NPP-Newbuild and look forward to taking the next important steps to Bulgaria’s energy security.”

According to Bulgaria’s official BTA news agency, Bulgaria’s Energy Minister Vladimir Malinov said the agreement was “another important step in the implementation of what is for Bulgaria and the region a strategic project for the construction of nuclear capacity”.

Kozloduy units 1-4 were VVER-440 models which the European Commission classified as non-upgradeable and Bulgaria agreed to close them during negotiations to join the European Union in 2007. Units 5 and 6 feature VVER-1000 reactors that were connected to the grid in 1987 and 1991, respectively. Both units have been through refurbishment and life-extension programmes to enable extension of operation from 30 to 60 years. The country’s two operable reactors generate about one-third of its electricity.

The aim is for the first new unit – unit 7 at Kozloduy – to be operational in 2035 and the second one – unit 8 – to be operational in 2037. The 2300 MWe capacity of the two new units would exceed the 1760 MWe capacity of the closed first four units. The Bulgarian government has also said that further units will be needed to replace units 5 and 6 by 2050.

In February, Hyundai E&C was shortlisted for the construction and commissioning of the new Westinghouse units. In September, Malinov said he expected an engineering contract to be signed in the coming months between Kozloduy NPP-Newbuild and a consortium of Westinghouse and Hyundai E&C.

Source link : http://www.bing.com/news/apiclick.aspx?ref=FexRss&aid=&tid=671ac82107ef4b83b785d15f1be9d572&url=https%3A%2F%2Fwww.world-nuclear-news.org%2Farticles%2Fwestinghouse-extends-feed-contract-for-kozloduy-ap1000s&c=2275462761928642818&mkt=de-de

Author :

Publish date : 2024-10-24 07:49:00

Copyright for syndicated content belongs to the linked Source.

Tags: BulgariaEurope
ADVERTISEMENT
Previous Post

A POINT WELL MADE! Celtic boss Rodgers showed that he CAN find middle ground between attack and defence in Europe after all

Next Post

Teenager stabs police officers in a police station in Bosnia, killing 1 and wounding another | iNFOnews

Related Posts

Bulgaria

What to Count on on March 31 – Novinite.com – EUROP INFO

Bulgaria

Greek exporters problem Bulgarian legislation favoring native items – FreshPlaza – EUROP INFO

Bulgaria

Blind Bulgarian runner defies sleep and exhaustion in ‘Everesting’ climbing problem – Reuters – EUROP INFO

ar Arabiczh-CN Chinese (Simplified)nl Dutchen Englishfr Frenchde Germanit Italianpt Portugueseru Russianes Spanish
en English
ADVERTISEMENT

Highlights

Romanian Centrist Set to Claim Presidential Win! – EUROP INFO

Estonian PM Vows to Stand Strong Against Russia’s ‘Shadow Fleet – EUROP INFO

Lithuania and Nine Nations Join Forces to Protect Underwater Infrastructure – EUROP INFO

Organizers Blame Israel – EUROP INFO

How Raising My Child in the Netherlands Transforms Motherhood and Career into a Seamless Journey – EUROP INFO

Categories

Select Category

    Archives

    Select Month
      October 2024
      MTWTFSS
       123456
      78910111213
      14151617181920
      21222324252627
      28293031 
      « Sep   Nov »
      • Contact Us
      • Privacy Policy
      • Terms of Use
      • Cookie Privacy Policy
      • DMCA
      • California Consumer Privacy Act (CCPA)
      No Result
      View All Result
      • Home
      • Politics
      • News
      • Business
      • Culture
      • Sports
      • Lifestyle
      • Travel
      • Opinion

      © 2024 Love-Europe

      This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.
      Go to mobile version